How can restaurants improve kitchen efficiency during peak hours?

Are the spaces, tools and tasks of your cooks flawless or will they collapse during peak hours? What works so well during the day at 2 pm are bottlenecks at 7 pm. What seems to be enough preparation of dishes during the day will become a huge problem on Saturdays when you need to serve the same dish for lunch and dinner.

Note, These would typically cost to implement and get returns of varying types and scales over time, listed here in rough order from lowest cost to highest.

restaurants improve kitchen efficiency

Design the line around ticket flow, not equipment categories

Kitchen layouts are typically organized by major appliance, but the true way to organize your kitchen is by the path that a ticket takes to complete it. By measuring the distance of the components of your twenty highest volume dishes, you will likely find that some components travel too far as separate components and need to be combined.

Organize your stations in zones so that each person in a zone can finish making their part of a dish before the other parts are completed by people in other zones. Cross traffic in the kitchen is one of the biggest problems facing otherwise good kitchens and it is easily solvable.

Test the layout before you commit

Simulate a service with your team on the proposed kitchen layout before you move the appliances. This will highlight any problems within 10 minutes as opposed to discovering them after the gas lines have been re-run.

Select equipment for recovery time, not headline capacity

The capacity of equipment as stated on the specs is usually for steady-state but that’s not how service actually works during peak times. You need to know how long it takes for the unit to come back up to temperature after a full load has been put in it. This is called the recovery time of equipment.

Recovery performance varies greatly between appliances, so it is worth comparing commercial restaurant equipment such as fryers built for strong thermal recovery and accurate thermostats. Combis, griddles and induction cooking appliances are all examples of such appliances that will perform consistently during busy periods.

Decision factorWhat to measureWhy it matters at peak
Thermal recoverySeconds to return to set point after full loadDetermines real throughput per hour
Footprint efficiencyOutput per linear foot of lineLine space is the scarcest resource
Service accessFront-serviceable or requires pulling the unitAffects downtime during trading hours
Control accuracyTemperature variance across the cooking surfaceDrives consistency and reduces remakes
Energy drawIdle versus active consumptionCompounds across a long service day

Shift work out of the service window

Preparing ahead of time to use as much time as possible before serving takes away from time needed to serve dishes that were prepared ahead of time. Time needed to prepare items just before serving needs to be identified and the amount of time spent preparing ahead of time for the other dishes held and served needs to be minimized.

  • Portion and weigh proteins in advance, labeled by dish rather than by ingredient.
  • Pre-blanch items that finish quickly, so the fryer or pan only completes the cook.
  • Batch sauces and dressings to a known par level based on the last four comparable services.
  • Build mise en place containers that match one station’s needs exactly, with no shared reaching.

Set par levels from data, not memory

Use sales mix history to pre-prepare sufficient quantity of items for the average number of that item that will be required for that day of week and top-up with set quantity to cover against shortfalls.

Control the pace of incoming tickets

Ticket arrival time into the kitchen is often one of the largest variables that cannot be controlled. These factors are often grouped into 4 main categories, Seating Plan, Course Pacing, KDS Rules and Historical Information.

  1. Stagger table seating in intervals rather than filling the room at once.
  2. Use the display system to group tickets by cook time so the grill is not handed five long items simultaneously.
  3. Give the expediter authority to hold and release, and brief servers on what that means for quoted times.
  4. Agree on a clear signal for when the kitchen is approaching capacity, and act on it before the pass is buried.

Measure what actually constrains throughput

Instead of averaging out the wait time for your entire kitchen over time, track the time it takes to serve each ticket at each individual station. This will help to reveal hidden problems in your kitchen instead of masking them under an average. Re-checking your prep, adding a second holding drawer, re-sequencing a single dish, moving one container 18 inches….all of these things can solve problems in your kitchen during peak times.

Review after each heavy service

Make a note for 5 minutes after service on all dishes that caused delay and on why this was the case. In the following month, all investment decisions for menu, equipment and staff will have so much more impact than the pretty pictures of dishes, than comments and than emails.Read more at https://activepropertycare.us/.

Comments

No comments yet. Why don’t you start the discussion?

Leave a Reply

Your email address will not be published. Required fields are marked *